A UDOT Project

Connect with Us

Alternative screening

Final Alternatives Screening Results Report

UDOT published the Final Alternatives Development and Screening Report on Sept. 6, 2024, which discusses improvements made to the originally proposed alternatives including updated screening results, the criteria and measures used to evaluate each alternative, and the screening results of any new alternatives that were evaluated based on public and agency comment received during the comment period on the Draft Alternatives Development and Screening Results Report. This report also identifies Alternatives A and C as moving forward for detailed evaluation in the Draft EIS.

ALTERNATIVES MOVING FORWARD

ALTERNATIVES ELIMINATED FROM FURTHER STUDY

Draft Alternatives Screening Results Report

UDOT published the Draft Alternatives Development and Screening Results Report on Feb. 26, 2024. This report identifies criteria and measures for evaluation, details the screening process, and identifies which alternatives are carried forward for detailed evaluation in the Draft EIS.

A public comment period was open from February 26 – March 27, 2024.

Kimball Junction EIS Alternatives Development & Screening Summary - Feb. 26, 2024

Our team has provided a detailed summary of the Alternatives Development and Screening report, including the potential transportation improvements we evaluated and which options are moving forward in the EIS.

Time stamps to topics within the video:

  • Introduction – Becky Stromness
  • Purpose and Need – Becky Stromness 1:05
  • Screening Process – Becky Stromness 1:27
  • Alternative A Overview – Becky Stromness 2:31
  • Alternative A Refinements – Kelly Johnston 4:19
  • Alternative B Overview – Becky Stromness 6:58
  • Alternative B Refinements – Kelly Johnston 7:55
  • Alternative C Overview – Becky Stromness 10:45
  • Alternative C Refinements – Kelly Johnston 11:32
  • Level 3 Screening Overview – Becky Stromness 14:49
  • Level 3 Results – Charles Allen 15:42
  • Level 4 Screening Overview – Becky Stromness 21:54
  • Level 4 Results – Heidi Spoor 22:21
  • Screening Summary – Becky Stromness 26:40
  • Schedule & Next Steps – Becky Stromness 27:45
  • Public Outreach – Carissa Watanabe 28:25
  • Conclusion – Becky Stromness 29:07
Play Video
Alternative A Fact Sheet​
Alternative B Fact Sheet
Alternative C Fact Sheet

Alternatives Development and Screening Criteria

UDOT published the Alternatives Development and Screening Methodology Report on April 28, 2023. This report identifies criteria and measures for evaluation and guides which alternative(s) is carried forward for detailed evaluation in the environmental impact statement (EIS).

A public comment period was open from April 28 – May 28, 2023. The community was asked for input on the criteria, measures, and data used to screen the alternatives in the EIS.